HPG Notable Projects

Kapiolani Terrace

Honolulu Airport Air Traffic Control Tower

300 Rogers Blvd. Honolulu HI

Duration: 30 days • Completed: November 2015
Length: 166ft • Depth: 4ft • Built: 1979

Problem

Major clog due to severely corroded cast iron waste piping.

Solution

Emergency underground mainline waste replacement and restoration and asphalt replacement

Kapiolani Terrace

Liliuokalani Plaza

222 Lili’uokalani Ave. Honolulu HI

Duration: 2 months • Completed: Pending
Units: 48 • Stories: 14 • Built: 1969

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Kapiolani Terrace

Waikiki Skytower

2410 Cleghorn St. Honolulu HI

Duration: 3 months • Completed: February 2020
Units: 102 • Stories: 30 • Built: 1978

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Kapiolani Terrace

Waikiki Sunset

229 Paoakalani Ave. Honolulu HI

Duration: 30 days • Completed: March 2019
Units: 435 • Stories: 38 • Built: 1979

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete laundry waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Kapiolani Terrace

Makiki Bel Aire

1543 Makiki St. Honolulu HI

Duration: 3 months • Completed: March 2019
Units: 40 • Stories: 6 • Built: 1966

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Kapiolani Terrace

Makini @ Kinau

1050 Kinau St. Honolulu HI

Duration: 2 months • Completed: December 2019
Units: 88 • Stories: 11 • Built: 1969

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete kitchen waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Kapiolani Terrace

3003 Kalakaua

3003 Kalakaua Ave. Honolulu HI

Duration: 2 months • Completed: March 2020
Units: 24 • Stories: 12 • Built: 1962

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Kapiolani Terrace

Kealani Waikiki

2533 Ala Wai Blvd. Honolulu HI

Duration: 6 months • Completed: May 2018
Units: 53 • Stories: 16 • Built: 1970

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Kapiolani Terrace

Princess Leilani

1561 Kanunu St. Honolulu HI

Duration: 6 months • Completed: October 2019
Units: 136 • Stories: 20 • Built: 1970

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Kapiolani Terrace

Kapiolani Terrace

1560 Kanunu St. Honolulu HI

Duration: 6 months • Completed: May 2018
Units: 266 • Stories: 17 • Built: 1973

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Kapiolani Terrace

The Greenview

1160 Ala Napunani St. Honolulu HI

Duration: 6 months • Completed: May 2018
Units: 126 • Stories: 18 • Built: 1979

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Kapiolani Terrace

620 Sheridan

620 Sheridan St. Honolulu HI

Duration: 35 days • Completed: February 2019
Units: 52 • Stories: 3 • Built: 1962

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration
Complete bathroom, kitchenette and interior restoration

Kapiolani Terrace

Country Club Vista

3050 Ala Poha Pl. . Honolulu HI

Duration: 2 months • Completed: April 2017
Units: 41 • Stories: 21 • Built: 1982

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Turnkey drywall and paint restoration
Exterior  access required
Majority of the plumbing replaced by using a swing stage
Exterior  stucco, restoration and paint

Punahou Tower

Waikiki Prince Hotel

2431 Prince Edward St. Honolulu HI

Duration: 4 months • Completed: October 2017
Units: 30 • Stories: 6 • Built: 1960

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.
Aged and tired interiors

Solution

Complete sanitary waste and vent system replacement
Turnkey drywall and paint restoration
Complete bathroom, kitchenette and interior restoration

Kapiolani Terrace

Wilder At Piikoi

1201 Wilder Ave. Honolulu HI

Duration: 3 months • Completed: November 2016
Units: 166 • Stories: 30 • Built: 1979

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Turnkey drywall and paint restoration

Punahou Tower

Kapiolani Royale

2474 Kapiolani Blvd. Honolulu HI

Duration: 4 months • Completed: May 2016
Units: 66 • Stories: 17 • Built: 1976

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.
Aged and tired interiors

Solution

Complete sanitary waste and vent system replacement
Bathroom fixtures reset and shower stalls rebuilt
Turnkey drywall and paint restoration

Kapiolani Terrace

Lakeshore Tower

2920 Ala Ilima St. Honolulu HI

Duration: 4 months • Completed: January 2016
Units: 96 • Stories: 16 • Built: 1971

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Individual unit  valves replacement
Bathroom fixtures reset and shower stalls rebuilt
Turnkey drywall and paint restoration

Punahou Tower

Continental Plaza

1050 Lunalilo, Honolulu HI

Duration: 5 months • Completed: January 2015
Units: 72 • Stories: 12 • Towers: 2 • Built: 1981

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete fan coil system replacement
Turnkey drywall and paint restoration

Punahou Tower

Punahou Tower

1617 Dole St. Honolulu HI

Duration: 5 months • Completed: October 2017
Units: 96 • Stories: 13 • Built: 1973

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Kapiolani Terrace

Hale Umi

715 Umi St. Honolulu HI

Duration: 3 months • Completed: November 2016
Units: 102 • Stories: 30 • Built: 1978

Problem

Multiple unit repairs due to severe flooding.

Solution

Emergency complete unit insurance remodel
Turnkey drywall and paint restoration

Punahou Tower

Diamond Head Hillside

3151 Monsarrat Ave. Honolulu HI

Duration: 2 months • Completed: February 2013
Units: 30 • Stories: 5 • Built: 1967

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping as well as leaking copper water supply piping.

Solution

Complete sanitary waste and vent system replacement
Complete water supply system replacement
Turnkey drywall and paint restoration

Punahou Tower

Mott Smith Laniloa

1717 Mott-Smith Drive Honolulu HI

Duration: 18 months • Completed: June 2023
Units: 428 • Stories: 34 • Built: 1976

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary drain, waste, and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Punahou Tower

Makiki Royal

1330 Heulu St. Honolulu Hi.

Duration: 4 months • Completed: October 2023
Units: 44 • Stories: 22 • Built: 1971

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping

Solution

Complete sanitary waste and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration

Punahou Tower

Princess Kealoha

1333 Heulu Street Honolulu HI

Duration: 6 months • Completed: October 2023
Units: 72 • Stories:12 • Built: 1972

Problem

Multiple leaks due to severely corroded cast iron waste and vent piping.

Solution

Complete sanitary drain, waste, and vent system replacement
Asbestos Removal
Turnkey drywall and paint restoration